Alhanafy Architects
FAQ

Frequently Asked

Pricing

It depends on the size of your space, the finish level, and how much customization you want. We quote every project individually after an initial consultation, rather than pricing off a flat per-square-meter rate.

Process

Apartments typically take 8–10 weeks from design to handover. Villas usually take longer given the larger scope — we confirm an exact timeline after the initial consultation.

Services

Architectural design covers the building itself — layout, structure, and construction drawings. Interior design covers everything inside once the shell is built.

Logistics

Our primary base is El Sadat City, Egypt, and we take on projects nationwide — including Cairo, Alexandria, and Giza. Reach out with your location and project details and we'll confirm whether we can take it on.